Place of Origin:
Henan,China
Brand Name:
Lanphan
Certification:
CE ISO
Model Number:
LPA-60
Chemical Reagent In Industry Solvent Recovery Machine
Product Parameter
Product Model | LPA-20 | LPA-30 | LPA-60 | LPA-200 |
Total Volume | 28 L | 46 L | 80 L | 330 L |
Charging Volume | 20 L | 32 L | 60 L | 225 L |
Recovery Time | about 3 hours | about 4~5 hours | about 4~5 hours | about 4~5 hours |
Heating Temperature | 50~210℃ | 50~210℃ | 50~210℃ | 50~210℃ |
Coolong Method | air cooling | air cooling | air cooling | air cooling |
Environment Temperature | 5~30℃ | 5~30℃ | 5~30℃ | ﹣20~50℃ |
Charging Method | Manual Charging | Manual Charging | Manual Charging | Manual Charging |
Discharging Method | Dumping | Dumping | Dumping | Dumping |
Recovery Rate | ≥95% | ≥95% | ≥95% | ≥95% |
Power | 220V/50HZ | 220V/50HZ | 220V/50HZ | 3P/380V/50HZ |
Net Weight | 93 KG | 122 KG | 136 KG | 629 KG |
Product Description
Solvent recovery machine is a special equipment to regenerate and recycle waste organic solvents. Discarded or colored waste solvents (such as diluent, EA, CH2Cl2, xylene and most of the organic solvents used for cleaning) are reduced to clean solvents through this equipment, and then put into production or experiments to achieve multiple use of solvents.
Installation Environment Requirements
1. The site is well ventilated;
2. The equipment needs to be grounded;
3. All electrical appliances on site must meet explosion-proof requirements;
Working Procedures
Preparation:
Operating:
Step 1: The heating temperature is 45-50°C higher than the boiling point of the solvent (for example: the boiling point of the solvent is 70°C, and the heating temperature is set to 120°C).
Step 2: The high temperature alarm setting is 20°C higher than the heating temperature (for example: the heating temperature is 120°C, and the high temperature setting is 140°C)
Step 3: Set the shutdown temperature, which is 15°C lower than the boiling point of the solvent (for example: the boiling point of the solvent is 70°C, and the shutdown temperature is set to 55°C).
When using the equipment for the first time, adjust the time to the maximum; the operator records the time of the first start-up, the time of clean solvent outflow, and the time of shutdown. The total power-on time is reduced by 20 minutes, which is the initial setting of the time controller. The time can be appropriately increased or decreased according to the situation of the residue in the actual operation.
Turn the start switch from “OFF” to “ON” position.
Turn on the power and start the switch to the “START” position.
The running light is on, and the electric fan is running.
When the heater indicator light is on, it means that the machine has started to heat up; the machine runs automatically according to the set temperature.
The machine automatically maintains a constant temperature.
The clean solvent will automatically flow out after the warm-up time.
Start switch; Turn off the knife switch that provides power. Check the heat medium oil temperature, which is very close to the residue temperature; Make sure the heat medium oil temperature is close to room temperature, open the barrel cover, pull the lock pin, dump the residue, keep the tank clean for next recycling.
Send your inquiry directly to us